Thanks for the input jay. Here are my clear questions about how to proceed
Here are the pics I shared from my facebook page.
Share of Yard Album Pics on facebook
Attached is a drawing too.
55' trench. (I seperate them into parts because their grade is different Maybe this isnt important for my question)
----Part A. first 15' wider steeper and lined with landscape fabric, rocks, and 2" perforated pvc pipe. slope is 4" over 15'. unfinished. See pics
----Part B. balance of length of trench 35-40' is already buried. landscape fabric, rocks, 2" perforated pvc, landscape fabric folded over the top, soil, and sod See pics. Slope is 3" over approx 35-40 feet
Questions:
1. Trench Part A...would it be better for me to remove the pipe? Does it really add value?
2. Trench Part A Would it be an issue for me to cover the top with fabric, and bury it in soil and sod it or should I leave it as a gravel path? Reason I ask it is soil on top would give me the option to put a concrete sidewalk, pathway or steps there later.
3. Trench Part B...Would it be better for me to remove the pipe from my trench and just use rocks since it is so shallow?